Friday, July 30, 2010

ORDERS ON FILLING UP OF ALL EXISITING VACANT AND ANTICIPATING VACANCIES ISSUED
One of the major demands we put forth in the strike charter is to fill up all vacant posts including residual vacancies and the vacancies which are unnoticed by some divisional administrations in many circle or due to wrong assessment of vacancies.The department has earlier sought information’s recently about the pending vacancies in all cadres and instructed that if a post is managed even for a single day within one year that post should be taken as a clear vacancy. The said instruction has cleared many doubts prevailing in the midst of many circles and divisions.Now the Directorate has issued instructions to fill up all the EXISTING as well as anticipatory vacancies of the year 2010 vide its letter no 60-9/2010-SPB-I dated 22.7.2010 with time schedule.
The copy of the orders is reproduced hereunder.

ALL CIRCLE SECRETARIES AND DIVISIONAL SECRETARIES ARE REQUESTED TO ENSURE THE NOTIFICATION OF ALL EXISTING VACANCIES AS PER THE ESTABLISHEMENT SANCTIONED STRENGTH OF THE DIVISIONS. IN THE EVENT OF FAILURE PL TAKE UP IMMEDIATELY WITH THE CIRCLE HEADS AND IF THE INTERVENTION FROM DIRECTORATE IS REQUIRED PLEASE DON’T HESITATE TO WRITE TO US.
Appeal to the Secretary, Department of Posts
As assured in the conciliation meeting held on 12.7.2010, we are expecting your effective intervention through video conference for ensuring to fill up all the vacant posts as per the establishment register. Further we seek immediate release of orders removing the application of bench mark for MACP promotions as per the railway pattern as assured to release on the same day.
60-9/2010SPB-1
Government of IndiaMinistry of Communication & IT(Department of Posts)
Dak Bhavan, Sansad Marg,New Delhi -110001Dated 22nd July, 2010
ToAll Chief Post Masters General.
All Post Master GeneralCGM, PLI
Subject: - Filling up of the posts of Postal Assistant/ Sorting Assistant by Direct Recruitment.
Sir/Madam,
I am directed to refer to this Department’s letter No 60-16/2009-SPB-1 dt. 12.11.2009 on the above subject and to say that the matter regarding filling up of the posts of Postal Assistant/Sorting Assistant pertaining to the years 2009 has been reviewed and it has been decided that the direct recruitment vacancies of the year 2009 and existing as well as firm anticipated vacancies of the year 2010 may be filled up by direct recruitment as per the existing instructions issued vide this Department’s letter No 51-2/2003-SPB-1 dated 10.11.2004. It may please be ensured that the recruitment process is finalized and results declared by 16th December 2010.2.
2)In order to finalize the recruitment process by the said target date all are requested to ensure that following steps leading to the selection of the candidates are taken/completed not later than the dates indicated against each:
Advertisement/Circulation of vacancies for the years 2009 and 2010 20th August, 2010
Last date for receipt of the applications 05th October, 2010Holding of written examination and completion of computer test November, 2010
Declaration of final result/Select list 16th December, 2010

If any circle so desires it may continue to follow the system of holding the computer test after or before holding the written/aptitude test but it must be ensured that the process of holding of written examination and computer test is completed by 14th November, 2010 and the time limit prescribed for declaration of final result is strictly adhered to.
3. The receipt of this letter may please be acknowledged.
Yours faithfully
(V.C.KAJLA)
DIRECTOR SPN
Tel No. 23096092

Wednesday, July 14, 2010

Wednesday 14 July 2010

MINUTES OF THE MEETING
Minutes of the Meeting held on 12.07.2010 to consider Charter of Demands given by the Staff side along with their notice of indefinite strike w.e.f. 13.07.2010.Meeting was held under the chairpersonship of Secretary (P), in which the following were present:Official Side1. Shri P.K. Gopinath, Member Postal Services Board2. Ms. Kalpana Tiwari, CGM (MB&O)3. Ms. Suneeta Trivedi, CGM(BD &M)5. Shri A.K. Sharma, DDG (Estt)6. Shri Shri Salim Haque, DDG (P)7. Shri Y.P. Rai, DDG (RB)8. Shri P.K. Sinha, DDG (PAF)9. Shri N.K. Tyagi, CE (Civil)10. Shri Subhash Chander, Director (SR & Legal)
Staff Side1. Shri D. Theagarajan, Secretary General, FNPO.2. Shri R.N. Parashar, Asstt. Secretary General, NFPE.3. Shri K.V. Sridharan, General Secretary, AIPE Union Class. III4. Shri D. Kishan Rao, General Secretary, NAPE Group ‘C’.7. Shri Giri Raj Singh, General Secretary, AI RMS&MMS EU Group ‘C’. 5. Shri Ishwar Singh Dabas, General Secretary, AIPEU Postmen & MSE/Group ‘D’6. Shri T.N. Rahate, General Secretary, NUPE Postmen & Gr ‘D’8. Shri P Suresh, General Secretary, AIRMS & MMS Employees Union, Mailguard and Multi Skilled employees9. Shri A. H. Siddique, General Secretary, NU RMS & MMS Employees, Mail Guards and Multi-skilled Employees.10. Shri Pranab Bhattacharjee, General Secretary, Admn (NFPE).11. Shri O.P. Khanna, General Secretary, Admn (FNPO)12. Shri P. Rajanayagam, General Secretary, AIPAEA.13. Shri S.S. Mahadevaiah, General Secretary, AIPEDEU14. Shri P.U. Muralidharan, General Secretary, NUGDS.
Secretary General of NFPE and Assistant Secretary General of FNPO conveyed their sincere thanks for convening the meeting and there after discussion started on Charter of Demands. The action points emerging out of discussions are as follows:
Item No. 1(a) Roll back steps of privatization of Speed Post processing, mail conveyance and data entry work.The Chairperson made it clear that in case of bulk Speed Post articles and where there is shortage of staff, outsourcing is being done so as to ensure fast movement of articles. However, there is no such policy of the Government either in case of Speed Post articles or for other accountable articles. In the context of Staff Side reference about anti-social elements dealing with the Speed Post articles, an enquiry will be made in this regard.
(b) Cancel the order for downgradation of EDSOs to EDBOs and closure of EDBOs.Necessary clarification on the demand of the Staff Side about drawal of increments in case of downgradation of EDSOs to EDBOs will be issued. A presentation will be arranged by Technology Branch for the Staff side to demonstrate all the technological developments that are taking place especially in the context of functioning of EDSOS/EDBOS.
(c) Cancel the decision to close down “C” Class Post Offices.The Staff Side was informed that no such order has been issued by the Department. They were further explained that the policy of the Department was to relocate Post Offices to new areas/townships which are growing. The idea is to rationalize to meet emerging needs. Suitable instructions, in this regard, will be issued to all Heads of Circles.
(d) Outsourcing of mail conveyance.Purchase of departmental vehicles for conveyance of mail will be pursued.
Item No. 2(a) Stop violations in the agreements on Status quo of RMS & MMS as well as merger of RMS with less than 10,000 mails.Reports will be called for from the Circles against the order of status quo.
(b) Create scientific norms for the work in CRC, Speed Post, Logistics and EPP.This item will be discussed with the Staff Side in a separate meeting to be taken up by CGM (MB & O). Date and time of the meeting will be intimated by Director (SR & Legal), after consultation with CGM (MB & O).
Item No.3(a) Holding of JCM Departmental Council Meetings and periodical meetings with Federations/Associations.Departmental Council (JCM) Meetings and periodical meetings will be held at regular intervals.
(b) Referring the issue of discrimination of pay scales between the Telecom TBOP/BCR and Postal TBOP/BCR w.e.f. 1.1.1996 to Board of Arbitration.This Item will be considered as a part of cadre restructuring of Group “C” employees in PA/SA cadre. In the context of cadre restructuring, the Chairperson gave direction for expeditious consideration so as to complete the process before the close of this year.
(c) Holding of GDS Committee Meetings periodically with GDS Unions.Periodical meetings as prescribed will be held at regular intervals.
Item No.4Stop harassment of staff under Project Arrow.Data sent by various Circles will be subject to proper scrutiny. Heads of Circles will also be addressed to furnish correct information.
Item No.5(a) Undertake reassessment of vacancies in PA/SA cadre (including Circle Offices) to rectify mistaken calculation of vacancies in all circles.The position will be reviewed Circle wise for necessary follow up action to be completed before 15th August 2010. For expeditious disposal, video conferencing will be done with the concerned Heads of Circles.
(b) Fill up all vacant posts in all cadres in Department of Posts as on 31.12.2009.Information in regard to residual vacancies remaining unfilled will be called for from all the Circles for necessary follow up action in this regard.
(c) Allow local recruitment as one time measure in Postal Accounts similar to 1997 Sundernagar.DDG (PAF) will examine the matter in accordance with the existing rules and instructions on the subject.
Item No.6(a) Cadre Restructuring of Group C employees (other than accounts cadre).A Committee comprising DDG (Estt), DDG (P) and Director (SPN) and three members from Staff Side, to be nominated by them, will be constituted to examine the proposals in detail and submit recommendations. The entire process is to be completed before the close of the year.
(b) Withdrawal of order regarding cadre restructuring of Postmasters cadre until comprehensive cadre restructuring of PA/SA cadre is completed.The Staff Side will be apprised of the details of the new Cadre.
(c) Cadre Restructuring of LDC, Sorters & DEOs in PAOs..Necessary action to be taken by DDG (PAF).
Item No.7(a) Grant of Pension, Departmental status to Gramin Dak Sevaks, grant of HRA/CCA, ACP including trade union rights and welfare measures.Welfare measures in favour of Gramin Dak Sevaks viz relief in case of prolonged illness, relaxation of education assistance schemes will be placed before Postal Staff Welfare Board in its next meeting. The issues of annuity and Health Scheme have been taken up with the Nodal Ministries.
(b) Remove discrimination on bonus ceiling.Matter is subjudice.
(c) Modify the Rs.20,000 cash handling work points for GDS BPMs – withdraw orders denying revised TRCA wef 1.1.2006 in respect of BPMs.Matter is subjudice.
(d) Compute work norms for all types of work performed including NREGS, PLI, RPLI, Pension Payments etc to GDS.The issue will be examined.
(e) Implement enhanced Social Security to GDS like Ex-Gratia Gratuity and Severance Amount w.e.f 1.1.2006.The benefits were extended as per past practice.
Item No.8(a) Grant of parity in pay Scale (PB-1 with 2400/-) for MMS Drivers on par with Drivers of Parliament Secretariat.Staff Side was apprised that the matter was taken up with the Ministry of Finance but did not find favour.
(b) Recruitment of adequate number of drivers.To be considered along with the issue of filling up of vacancies.(c) Sanction of OSA for the long distance logistics van drivers of MMS.Mail Branch will look into it. Action to be completed expeditiously.
(d) Technology training to Work Shop staff and grant of Data Entry Operator’s scale of pay to Work Shop Staff.DDG (Trg) to take necessary action for providing technical training to Work Shop Staff.
Item No.9(a) Revision of wages from 1.1.2006 in respect of RRR Candidates, Casual Labourers, Contingent Staff.Issue of RRR Candidates being sub judice, no action. The case of Casual Labourers is being examined. To be followed up vigorously.
(b) Grant of temporary status to eligible full time status casual labourers, convert part time into full time, absorb full time, part time, contingent in vacant GDS Posts.The entire issue of Casual Labourers will be looked into with the objective of liquidating their number as per policy of the Government.
Item No.10(a) Fill up all vacancies of Postmen and Mail guardsTo be considered along with filling up of all vacancies in the Department.
(b) Modify certain unscientific work norms of Postmen/MTS finalized by Work Study Unit.The existing norms will be reviewed after six months from the date of its issue. The Circles have been addressed to give their feed back in the matter and the review process will be completed by October 2010.
(c) Enhance the Postman Double duty Allowance as per the recommendations of 6th CPC.The entire issue of double duty allowance will be reviewed by October 2010 by a Committee. The Chairperson directed that all issue relating to Postmen will be discussed separately.
Item No.11Remove all local anomalies in MACP Scheme like application of benchmark of the period prior to introduction of MACP Scheme; grant MACP on Average benchmark like Department of Railways; denial of regular promotion earlier to introduction of MACP.In the context of bench mark for grant of MACP within PB-1, it was desired to issue order on the pattern of the order having been issued by Ministry of Railways, immediately. The matter will be pursued.
Item No.12Creation of System Administrators Cadre and financial compensation for special work performed by System Administrators.A Committee consisting of DDG (Estt), DDG (P) and DDG (Technology) will be formed to consider this aspect along with cadre restructuring of PAs/SAs. As regards grant of Road Mileage Allowance, mater is under examination.
Item No.13Recruitment Rules for Multi Tasking StaffThe draft rules to be referred to Department of Personnel for their approval. As regards educational qualifications of existing Gramin Dak Sevaks and Casual Labourers for appointment as multitasking staff, status quo will continue.
Item No.14Amalgamation of Group C Accounts Cadre.No action.
Item No.15Roll back of the decentralization of PLI/RPLI – Augment required staff strength and filling up of vacant posts.The proposal to be considered by PLI Directorate and any problem in this regard to be reported to Secretary (P) within a week.
Item No.16Parity of scale of pay of Ministerial Cadre in Postal Civil Wing on part with the Postal Assistants and upgradation of posts of Works Clerk Grade – II/head Clerk – Filling up of all vacant posts of technical as well as ministerial posts – Creation of one Civil Wing Circle for each Postal Circle.The Staff Side will take up this issue separately.
Item No.17Regularize the HSG-I, HSG-II, LSG arrangements and grant Officiating Pay and Allowances to all Officials holding the posts.The issue will be looked into afresh in view of the provision made in Postal Manual Volume IV, as stated by the Staff Side, as also in the light of prevailing instructions of the Government of India on the subject.
Item No.18Enhance OTA and OSA rates in tune with the 6th Central Pay Commission.The question of enhancing OTA rates stands referred to the Committee of Secretaries by the Nodal Department. The enhancement of OSA rates will be examined by Mail Branch and is to be completed within one month.
--General Secretary.

Monday, July 12, 2010

STRIKE DEFERRED- Outcome of Discussion held in the meeting with Secretary (P) on 12th July2010 -

STRIKE DEFERRED
Proposed indefinite strike from 13.07.2010 deferred
The Secretary, Posts had taken a meeting with staff side on 12.07.2010 to discuss the charter of demands at 11 am and the following are the outcome on the charter of demands.
1. There will be no closure of single handed post offices.
2. The demand of the staff side that the annual increments to the erstwhile GDS SPMs should be continued will be considered positively.
3. There is no policy decision of the department to outsource any of the postal services.
4. A separate meeting will be held on 15.07.2010 to discuss about the Mckinsey and the object of restructuring the services.
5. Another separate meeting with the staff side will be held about the technology proposals shortly to discuss the future expansion of technology.
6. There will be no violation of earlier agreement on status quo of RMS & MMS with 10000 mails. Any violation if brought to the Directorate’s notice it will be set aside.
7. The Departmental council & periodical meetings will be held regularly hereafter. Next meeting will be held in next month August 2010.
8. The demand of higher pay to TBOP &BCR for the earlier period will be considered along with the cadre review proposals.
9. There will be no harassment in Project Arrow offices. Furnishing wrong data’s and showing as delivered or redirected will not be allowed hereafter.
10. The demand of the staff side to assess the vacancies as per establishment strength and actual strength in all cadres will be considered and all Chief PMGs will be addressed and appraised to fill up all the vacant posts forthwith during video conferences personally by the Secretary (P).
11. A committee consisting four staff side representatives with DDG(P) & DDG (Est) will be constituted and the process of the proposals of cadre review for all cadres will be completed before the end of 2010.
12. Separate discussions will be made on the proposal of creation of Postmasters cadre also.
13. The welfare schemes to GDS like grant of pension, medical, the proposals were already cleared by the Postal Board and submitted to nodal ministries for approval. It will be expedited.
14. It was assured to reconsider the norms for cash handling to BPMs and also fix fresh norms to RPLI and NREGIS scheme shortly.
15. The proposal for higher pay to Driver with Grade pay of 2400 has been sent to the Ministry of Finance.
16. The revision of O.S.A rates will be made within one month.
17. Technology training to workshop staff will be provided.
18. The proposals for the grant of minimum pay as per the Sixth CPC to casual labourers have been submitted to Ministry of Finance for approval. It will be expedited. The demand of the staff side to grant revised GDS pay to GDS substitutes will be considered.
19. The issues related to postmen norms, delivery, beat etc will be discussed shortly and final decision will be taken before the end of October 2010. One committee will be constituted to sort out the issues.
20. The plea of the staff side to ignore benchmark for MACP has been accepted and the Secretary told the DDG to cause orders today itself. Another request to ignore the earlier declining of LSG promotions prior to the receipt of MACP orders will also be considered.
21. The proposal of the staff side to create System assistant instead of System administrator will be considered along with the cadre review proposals. The orders relating to road mileage allowance will be released shortly. The distribution of work & responsibility etc will be looked into along with the cadre review proposals.
22. The Recruitment Rules for Multi tasked staff will be finalized shortly. Our request to finalise the rules with no educational qualifications as if available to erstwhile Group D has been accepted.
23 The issues relating to Postal accounts like filling up of posts, amalgamation of Group C etc will be discussed further with DDG (PAF).
24. The suggestions of the Admin union about centralization of PLI claim at RO & CO will be considered. Further a separate meeting will be organized with their union to discuss about their issues.
25. Clarificatory orders will be issued soon providing officiating pay to the officials holding higher posts like HSG II & HSG I.
26. The issues of the postal Civil wing will be discussed separately.
After the meeting, the JCA met and decided to defer the proposed strike duly considering the positive approach of the Secretary in settlement of our genuine demands.

----General Secretary.

Thursday, July 8, 2010

Indefinite Strike issue -

There will be meeting with Secretary (P) on the issue of Charter of Demands on 12 th July 2010 at 11.A.M. Keep Contact with CHQ for the Details. SBCO MACP issue, Vacencies, Posting of LSG/HSG-II/HSG-I, Disciplinary cases, Violation of Procedure is already put up to the DTE. Also it will be discuissed in the meetingby the NFPE federation as it is enlisted as Item of Charter of Demands. Support to CHQ by participating in indefinite Strike wef 13th July 2010 for Survival of SBCO and its Status. If we participaste in All India issues there is chance for us to get somthing. So it is necessary to make strike successful.-
- General Secretatry

Reviosion of Pay wef 1.1.2006- Clarification regarding -employees having date of increment as 1.1.2006

Another demand placed in the anomaly committee is sorted out. Govt servants can revise their initial option for Pay fixation up to 31/12/2010 under CCS (Revised Pay) Rules 2008- Orders from Finance Ministry

Ministry of Finance, Department of Expenditure Vide its Memo No.7/14/2010-E.III (A) dated 05/07/2010 provided the CG employees to Change their initial fixation option up to 31/12/2010, in case if the option is more beneficial to them. The copy of the order is furnished below.

F.No.7/14/2010-E.III (A)Government of IndiaMinistry of FinanceDepartment of Expenditure
New Delhi, the 5th July, 2010.

OFFICE MEMORANDUM

Subject:- Central Civil Services (Revised Pay) Rules, 2008- Revision of option exercised under Rule 6 of the Central Civil Services (Revised Pay) Rules, 2008

In accordance with the provisions contained in Rule 11 of the Central Civil Services (Revised Pay) Rules, 2008, where a Government servant opts to continue to draw his pay in the existing scale from the 1st day of January 2006 and switch over to the revised scale from a date later than the 1st day of January, 2006, his pay from the later date in the revised scale is required to be fixed under Rule 11(i) of the Central Civil Services (Revised Pay) Rules, 2008. As per Rule 5 of these rules, this option to switch over to the revised pay structure from a date later than 1.1.2006 is available to a Government Servant:
2(i) Who elects to continue to draw pay in the existing scale until the date on which he earns his next or any subsequent increment in the existing scale or until he vacates his post or ceases to draw pay in that scale.
(ii) who has been placed in a higher pay scale between 1.1.2006 and the date of notification of these Rules on account of promotion, upgradation of pay scale etc. the Government servant may elect to switch over to the revised pay structure from the date of such promotion, up-gradation etc.
3. As per Rule 6 (1) of Central Civil Services (Revised Pay) Rules, 2008 the option in the format appended to the Second Schedule was required to be exercised within three months from the date of issue of these Rules.
4. Further Rule 6 (4) provided that the option once exercised shall be final. The Staff Side has represented on this issue and have requested that the first option exercised may not be treated as final keeping in view the new system of pay band and grade pays and that employee may be allowed to revise their option if the option is more beneficial to them.
5. On further consideration and in exercise of the powers available under Central Civil Services (Revised Pay) Rules, 2008, the President is pleased to decide that in relaxation of stipulation under Rule 6 (4) of these Rules employees may be permitted to revise their initial option up to 31.12.2010 if the option is more beneficial to them. The revised option shall be intimated to the Head of his Office by the Government servant in accordance with the provision of Rule 6 (2) of the Revised Pay Rules, 2008.
6. In so far as persons serving in Indian Audit and Accounts Department are concerned, these orders issue after consultation with the Comptroller and Auditor General of India.

(Renu Jain)
Deputy Secretary to the Government of India
For original
order

Wednesday, July 7, 2010

Federal Council of NFPE at Delhi-






I Attended 8Th Federal Council at Delhi on 19th June to 22 June 2010. Merger of both SBCO associations discussed with Recognition issue. It will be decided at the end of July 2010. AIC of SBCO associations will be held in first week of Aug.2010. Notice will be issued in due course.

It is decided to go on indefinite strrike wef 13th July 2010. SBCO issues are enlisted in the Charter of Demand for the first time by the Postal JCA. It is published here. All trade unions will go on strike. Support for out status and identity to the strike. The meeting with Secretary (P) will be held on 12th July to discuss on strike issue & charter of demands. Keep contact with CHQ.

Federal council honoured General Secretary for his active role in federation on 20th July 2010.
- General Secretary.

Thursday, June 24, 2010

CHARTER OF DEMANDS OF POSTAL JCA

Dear Comrades / Colleagues -

A campaign material on the 17 Points Charter of Demands is placed hereunder by the Postal Joint Council of Action. Download the material and translate into respective Regional languages and use for effective campaigning amongst the employees.

Serve the Strike Notice at all levels on 4.6.2010 jointly by all Unions of Postal JCA when the All India Postal JCA of NFPE - FNPO - AIPEDEU - NUGDS will be serving the Notice on the Department of Posts.


1. Drop the move to outsource any function of the DoP including on the recommendations of McKinsey – Cancel the decision to close down 'C' Class Post Offices – Cancel the orders for down gradation of EDSOs into ED BOs and closure of EDBOs - Roll back steps of privatisation of speed post processing and mail conveyance and data entry work.



The decision of the Postal Board to summarily close down maximum single handed urban TSOs is most retrograde and against to the interest of service. It is nothing but a ruse mentioning the matter of convenience of taking leave by the officials as claimed by the department behind this move but withdrawal of postal services in the existing post offices is aimed in order to outsource the operations through franchisees. The orders on down-gradation of all GDS SOs into GDS BOs and closures of GDS BOs with the neighbouring Departmental TSOs are other retrograde steps with the ulterior motive for the introduction of more franchisee outlets. These steps will result in withdrawal of services to public and also cause adverse impact on staff interests. The Circle Administration here and there commenced operations to privatize the processing of speed post articles and outsource the mail conveyance and data entry work. The outsourcing and privatizing of postal operations is a negative step and huge revenue of the department is being diverted to private concerns. All these retrograde steps are to be rolled back by the Department.



2. Stop violations in the Agreements on Status Quo of RMS & MMS as well as the merger of RMS with less than 10,000 mails – Create scientific norms for the work in CRC, Speed Post, Logistics and EPP – Cancel the orders for replacing the General Line HSG-I by ASPOs in Mail Offices.



Despite agreements reached between the Department and the Staff Side, the Circle Administration in different circles are taking the liberty to close down RMS Offices and transfer headquarters with men and material in violation of the agreements. The attempts of Maharashtra Circle Administration to merge different RMS Offices with more than 10,000 letter mail volume and thus disturbing the status quo agreed to by the Department on 30th November high level discussions is an example. The Administration in total violation of the Statutory Rules is replacing the HSG-I General Line officials with the ASPOs based on some discussions and decisions taken in the workshop held at Bangalore among the officers and without any discussions with the staff side. These violations of agreements and statutory rules are to be rolled back immediately. The earlier agreement arrived with staff side to keep the mail offices with 10000 letter mails per day should be honoured in true spirit.



3. Holding of JCM Departmental Council meetings; Periodical Meetings with Federations; Sending of the issue of discrimination of pay scales between the Telecom TBOP/BCR and Postal TBOP/BCR w.e.f. 1.1.1996 to Board of Arbitration; and Holding of GDS Committee Meetings periodically with GDS Unions.



Despite reconstitution of Departmental Council JCM and submission of subjects by the Staff Side, no meeting of JCM Departmental Council is being convened. This negotiating forum has been locked up for years together and that is undermining the very basis of joint consultations on staff issues and unilateral implementation of several retrograde orders taking place. Similarly no Periodical Meeting with the Federations and All India Unions are taking place for a very long time and no such meeting has been convened despite recognition granted to the Federations. Similarly the holding of GDS Committee meetings has never re-commenced for a very long time which denies the only opportunity of negotiations to the GDS cadre on their genuine issues. Even the meeting of Departmental Anomaly Committee that has met once in which the staff side insisted for parity of pay scales between the Telecom TBOP/BCR and Postal TBOP/BCR w.e.f. 1.1.1996 but the Official side has not even recorded any disagreement on that issue for referring to arbitration. All these fora of negotiations should commence regular meetings and the issue of pay parity with Telecom should go for arbitration.



4. Stop harassment of staff under Project Arrow – No extraction of work against Rules – No extraction of work beyond 8 Hours – No drafting of staff on duty and for Training etc on Sundays and Holidays – No harassment in the name of 100% Delivery – Withdrawal of all Punishments awarded to Postmen for minor non-delivery of articles.



In the Project Arrow Offices the staffs are being harassed to violate Manuals of Department but all such orders are kept as oral orders. The Staff side insists that all orders with regard to the functioning of the Project Arrow should be issued in writing by the Officers and no staff should be forced to implement oral orders of officers. There shall be no extraction of work against the Departmental Rules. The harassment against Postmen for 100% delivery should be stopped forthwith as 100% delivery is humanly impossible without violating Rules. There should be no drafting of Staff for training or duty on Sundays and Holidays without compensatory off and monetary compensation as well as expenses towards travelling etc. The full complementary strength as per blue book instructions should be maintained in Project Arrow Offices for which measurers like exclusive leave reserve staff for such offices shall be stationed without disturbing the actual strength of other offices. Punishments awarded for short of 100% delivery should be withdrawn immediately and Officers at all levels are to be instructed not to be vindictive. The unilateral extension of counter hours without providing staff and harassing the staff to look after the additional work without any compensation should be dispensed with. Ordering the officials to attend all Sundays and holidays without any off or weekly holidays to complete the pending work for core banking solutions should be stopped forthwith. The ILO norms on weekly holidays should be honoured.



5. Fill up all vacant posts: [a] Undertake reassessment of vacancies in PA/SA cadre to rectify mistaken calculation of vacancies in all circles; [b] Fill up all vacant posts in all cadres in Department of Posts [Postal, RMS, MMS, Admn, DPLI, Postal Accounts, SBCO, Civil Wing etc] as on 31.12.2009; [c] Allow local recruitment as one time measure in Postal Accounts similar to 1997 at Sundernagar.



There are large numbers of vacancies unfilled even now in different cadres. There were grave calculation errors in almost all the circles in assessing the vacancies of PA/SA cadre resulting more than 30 to 40% vacancies in the sanctioned establishment posts. The vacancies occurred due to LSG promotions were not taken as vacancies of those particular years. The vacancies kept under residual vacancies are not filled up and more than 5000 PA/SA vacancies are still kept unfilled under this category. This error should be rectified by causing reassessment of vacancies in all circles duly taking all the unfilled up vacancies in the establishment register and roll of the divisions as on 31.12.2009 as current year vacancies for 2009 and filled up the same in a time bound manner. As far as the Postal Accounts is concerned, local recruitment similar to 1997 recruitment at Sundernagar has to be permitted as one-time measure to come out from the heavy shortage of staff prevailing there. All vacant posts in all cadres of PA/SA postal; PA/SA RMS; Drivers and Workshop staff in MMS; PA CO in CO/RO/DPLI; PA SBCO; Postman/Mailguards/Multi Task Staff; and Civil Wing Ministerial and Technical should be filled up.



6. Comprehensive Cadre Restructuring of Group 'C' employees in PA/SA Cadre; [b] Withdrawal of unilateral orders on piecemeal cadre restructuring of Postmasters' cadre until comprehensive Cadre Restructuring of PA/SA cadre is completed; [c] Comprehensive Cadre Restructuring of LDC, Sorters & DEOs in Postal Accounts by amalgamation into a single Accounts Assistants cadre in the pay of Pb-1 with 2400 GP; [d] Comprehensive Cadre restructuring in PA CO cadre in CO/RO/DPLI; [e] Comprehensive cadre Restructuring of PA/SA cadre in SBCO; and [f] Comprehensive cadre restructuring of Postmen/Mailguard/Multi Task Staff.



Proposals for comprehensive cadre restructuring of all cadres in Postal Department was submitted immediately after the formal meeting held by the Secretary [P] on 13.01.2009 but even after one year and five months, no action has been initiated so far in this matter. The cadre restructuring in other CG Departments like Income Tax and Railways are gone to final stages. Unfortunately, the Department instead of going into comprehensive cadre restructuring of Group 'C' officials, has preferred to unilaterally restructure the 'Postmasters' cadre' distorting the existing promotional structure on the face of staff side objections. We demand immediate measures to comprehensively restructure all the cadres in the Department of Posts including the PA/SA in Postal and RMS/MMS, the Postal Accounts, Circle Offices, DPLI, SBCO, Postmen/Mailguards, Multi Task Staff.



7. Grant of Pension, Departmental status to GDS extending the all benefits such as HRA/CCA, ACP etc, including Trade Union rights and welfare measurers – Remove discrimination on Bonus ceiling – Modify the 20,000 unilateral imposition of cash handling work points for GDS BPMs – Withdraw orders denying revised TRCA w.e.f. 1.1.2006 in respect of BPMs – Compute work norms to all types of work performed including NREGS, PLI,RPLI, Pension Payments etc to GDS – Implement enhanced Social Security to GDS like Ex-Gratia Gratuity and Severance Amount w.e.f. 1.1.2006.



Retirement benefits like ex-gratia and severance amount which were enhanced as recommended by the GDS Committee should be paid w.e.f. 1.1.2006 since all retirement benefits to regular employees on the recommendations of 6th CPC were implemented not from a prospective date but from 1.1.2006. Comprehensive schemes for departmentalisation of GDS by allocating proper work norms for PLI/RPLI, NREGS, Pension MOs and Bill Payments etc to enhance the work hours of GDS for facilitating departmentalisation should be worked out. Now with the large scale of expansion of PLI/RPLI as well as NREGS work coming up in a big way, there shall be change of approach towards GDS System to comprehensively departmentalise them. Grant of Pension, Grant of all benefits, Grant of Trade Union facilities, Grant of Welfare measurers etc to GDS shall be considered. The discrimination perpetrated in the name of GDS Committee to deny the parity on the matter of PLB Ceiling of 3500/- should be removed. The unscientific tightening of BPM work norms by enhancing the quantum of cash handling to 20,000/- per point should be modified.



8. Grant of Parity in Pay Scale [PB-1 with GP 2400/-] for MMS Drivers on par with Drivers of Parliament Secretariat – Recruitment of adequate number of Drivers – Sanction of OSA for the long distance logistics van drivers of MMS – Technology training to Work Shop staff and grant of Data Entry Operators scale of pay to Work Shop Staff.



The Drivers in MMS are to be granted PB-1 with GP 2400/- on par with the Drivers of Parliament Secretariat and all vacancies of Drivers shall be filled up immediately taking into account of total mail vans including the new vans purchased. The Drivers engaged in long distance logistics vans shall be granted with OSA. The Work shop staffs are to be imparted with the technology training and since they are involved in operations of computers for maintenance of modern power vehicles, they should be granted with the pay scale of PB-1 with 2400/- GP. There should be a system of third party insurance for Government vehicles also to off-set the liability of recovery of compensation from the Drivers on accidents.



9. Implement Supreme Court Orders for revision of wages from 1.1.2006 [6th CPC wages] to all RRR Candidates, Casual Labourers, Contingent staff, GDS Substitutes etc – Grant Temporary Status to eligible Full Time Status Casual labourers; Convert Part Time into Full Time; Absorb Full Time, Part Time, contingent in vacant GDS Posts.



All Casual labourers other than those conferred with Temporary Status are to be granted refixation of wages on the basis of minimum wages granted by the 6th CPC for corresponding category of staff w.e.f. 1.1.2006. The non-fixation of revised wages by the Department of Posts is contrary to Apex Court Judgement and directions. The GDS substitutes also shall be refixed with their wages on par with the revised GDS Wages w.e.f. 1.1.2006. It is seen that several eligible full time casual labourers in Department of Posts for conferment of Temporary Status are denied the status; Part Time casual labourers are not converted into full time casual labourers wherever possible; no recruitment as GDS is taking place from amongst the casual labourers. The casual labourers of all types are to be comprehensively absorbed in to the main stream either by granting temporary status or by providing GDS appointments as one time measure.



10. Fill up all vacancies of Postmen and Mailguards - Roll back the unscientific scheme of Single Postman Beat System – Modify certain unscientific work norms of Postmen / MTS finalised by Work Study Unit - Enhance the Postman Double Duty Allowance as per the recommendations of 6th CPC.



All vacancies of Postmen/Mailguards are to be filled up immediately. The unscientific insistence for conversion of double postmen beats into single postman beats should be stopped and reversed and at least blind insistence of single beat system in metro cities should be dropped in order to maintain efficiency and to compete the couriers. The work norms finalised by the department on the recommendations of Work Study Unit is unscientific in some areas, like delivery of ordinary letters; delivery of CD Articles etc. There is no time factor allotted for delivering 'Intimations' to addressees. There is no limit prescribed for the maximum distance of a Postman beat which is leading to construction of very lengthy beats for more than 50 kilometres, which is unscientific and humanly impossible. The double duty allowance payable to Postmen cannot be construed as overtime allowance but should be equated to at least to a minimum of a postman specific allowance paid for looking after the entire work of the absentee postmen. This allowance has to be enhanced by delinking this allowance from the concept of OTA.



11. Remove all local anomalies in MACP Scheme like application of benchmark for the period prior to introduction of MACP Scheme; Grant MACP on 'Average' benchmark like Department of Railways; Denial of MACP for acts of denial of regular promotion earlier to introduction of MACP; Denial to grant PB-2 while upgradation to Grade Pay 4200 and above to Group 'C' Officials etc.



MACP scheme is introduced in department of posts with several local anomalies. Prior to introduction of MACP scheme we were covered under the TBOP/BCR Scheme in which the question of 'benchmark' did not exist for grant of promotion or upgradation. Therefore the 'benchmark' should not be applied for the earlier years prior to introduction of MACP scheme. Moreover we find that the Railways have granted MACP on 'average' benchmark only. Similarly in the earlier system of TBOP/BCR, declination of regular promotion did not affect grant of TBOP/BCR and therefore the declination of regular promotion if any by officials in the past shall not be taken against grant of MACP for the past years before introduction of MACP. The Departmental orders on MACP wrongly denied PB-2 even when officials are to be upgraded into 4200/- GP and this mistake should be rectified by appropriate corrigendum. There are several queries raised and wrong implementation resorted to in many circles and therefore a comprehensive clarificatory instruction from Directorate with appropriate illustrations should be issued.



12. Creation of System Administrators Cadre with higher pay scales and absorption of all System Administrators in the new cadre during initial composition – Uniform Norms for System Administrators including work hours, number of systems, distance factor – Financial compensation for special and extra work performed by System Administrators.



There are approximately more than 2000 System Administrators working in Department of Posts without any such cadre creation. Their work is above the work of data entry operators. Either their work is comparable to System Engineers or to Data Processing Assistants or hence they should be a separate cadre with higher pay scales. A separate cadre should be created forthwith duly considering the cadre restructuring proposals submitted by the Group C unions and the existing systems administrators should be absorbed in the newly elevated creation posts by conducting a simple trade test. There are no uniform norms for their work, work hours, attendance etc. Their work should be codified with number of systems as well as distance factor uniformly. Additional financial compensation for special and extra work they put in shall be provided for.



13. Early finalisation of Recruitment Rules for upgraded Group 'C' in PB-1 with 1800 GP – Ensure present system of absorption of GDS and TS CLS in Group 'D' posts into the new RR without insisting for the educational qualification – Filling up all the posts of Multi Tasking Staff without any delay.



The Recruitment Rules for upgraded Group 'C' in PB-1 with GP 1800 is yet to be released in Department of Posts even after the model RR released by the DOPT. It should be ensured that the present system of recruitment into the cadre of Group 'D' from amongst the GDS and TS CLs on 75:25 basis without any condition on minimum educational qualifications should continue. These sections have been adversely affected due to large scale abolition of Group D vacancies in the recent past. Early finalisation of RR and commencement of recruitment should be ordered.



14. Amalgamation of Group 'C' Accounts Cadres of DoP and DoT.



The DoP and DoT Accounts have been merged but this merger has been restricted to Group 'B' and above cadres only. The Committee headed by Chief PMG Delhi Circle Shri.Ragahvlal had recommended that the merger of Group 'C' cadre of DoP and DoT should follow some time later than the merger of Group 'B'. Action may be initiated for merger of Group 'C' Accounts Cadre also.





15. Roll back of the Decentralisation of PLI/RPLI work – Augment required staff strength in PLI branch of CO/RO/DPLI –Maintain centralized accounting system through the Office of DPLI Kolkata – Fill up the vacant posts of COs/ROs/DPLI Kolkata to manage huge shortage;

In the background of technology introduction in the field of PLI/RPLI and its further modernisation, we suggest that there is no need for decentralised work in PLI/PRLI to avoid duplication of work. Due to heavy shortage in operative offices and divisions, the arrangement of extracting the work of PLI/RPLI from the field staff without augmenting their strength is causing difficulties. It is better to augment the PLI Branches of CO/RO to the minimum level and centralise the work in CO/RO with modern technology for better efficiency and customer satisfaction. The accounting system should be centralised and maintained through the Office of DPLI Kolkata. Simultaneously all vacant posts in CO/RO/DPLI should be filled up without further delay.



16. Parity of scale of pay of Ministerial Cadre in Postal Civil Wing on par with the Postal Assistants and upgradation of posts of Works Clerk Grade –II/Grade-I/Head Clerk – Filling up of all vacant posts of technical as well as ministerial posts – Creation of one Civil Wing Circle for each Postal Circle.



The Ministerial cadre in Postal Civil Wing may be restructured on par with the Postal Assistants. The posts of Works Clerk Grade-II/Grade-I/Head Clerk shall be upgraded. All vacant posts in both technical and ministerial posts in civil wing shall be immediately filled up. We urge for creation of Civil Wing Units for each Postal Circle instead of the present arrangement for better management of civil wing work.



17. Regularise the HSG-I, HSG-II, LSG arrangements and grant Officiating Pay & Allowances to all Officials holding the posts.



Once an official is ordered to work in a post with higher responsibilities he/she should be paid the Pay of corresponding higher posts. The denial of officiating pay and allowances for officials who officiated against the HSG-I and HSG-II / LSG posts was struck down by the Courts. Still the officiating pay and allowances to such officials is not sanctioned and officials in HSGII and LSG were ordered to officiate in higher posts without any higher officiating pay. The cases referred by Tamilnadu circle and West Bengal with regard to grant of officiating pay for the past cases may decided favourably. Immediate orders for payment of higher pay and allowances should be issued by Directorate

Is it necessary or beneficial to maintain identity of S.B.C.O as a internal audit branch?